Standard Commercial Products for External / Exterior / Outdoor Lighting System to be chosen as per the design requirement specified in the project documents including recommended and approved list of manufacturers.

 

Quality Assurance and Standards for External / Exterior / Outdoor Lighting System to be designed, installed and tested all in accordance with the recommendations of IEC, CISPR and Local Authority.

 

Submittals for External / Exterior / Outdoor Lighting System consists equipment data, compliance statements, shop drawings or construction drawings, samples, product certificates, field test reports, maintenance data and as-built (record) drawings.

 

External / Exterior / Outdoor Lighting System includes lighting units with luminaires, lamps, ballasts, poles / support structures, and accessories and related power distribution and control, protective earthing and related builder's work including column foundations, cable pits, cable trenches and...

 

Lightning Protection System should be in accordance with BS 6651 and IEC 61024 to protect the building structure and personnel from the risk of a lightning strike. The installation shall comprise air networks connected to roof and down conductors and finally terminated in earth electrodes, via...

 

A complete functioning Emergency Power Diesel Generating System shall be delivered, installed and commissioned, which shall include all necessary ancillary systems for combustion/cooling air supply, exhaust air, engine exhaust, fuel supply, power delivery and controls.

 

The Developer shall adhere to all safety rules, regulations and requirements of local authorities whatever it may be applicable to the construction site. The Developer shall follow all safety procedures prescribed in the AGC (American General Developer's) Manual of Accident Prevention in...

 

The Plot Developer shall be responsible for complying with the Master Owner's Environmental Impact Study, all local environmental standards, and Environmental Management Plan and be approved by Local Govt. Agency. A copy of the study is available for review at the Master Developer's Project...

 

The Plot Developer shall verify all measurements and be responsible for their correctness. The datum will be to as per local authority. Regardless of the availability of any survey markers on the Site, the Plot Developer shall be responsible to perform his own survey and establish survey markers...

 

It will be the Developers responsibility to obtain all necessary approvals from Authorities having jurisdiction for temporary connections to existing infrastructure. Temporary utilities shall be installed in such a manner as not to interfere with permanent construction.

 

Proper sanitation facilities shall be provided within the Plot Developers site offices. Each Plot Developer shall provide nursing and first aid facilities and responsible for arranging meals for his workmen and personnel. All plot Developers to comply with the local labour laws and regulations.

 

The extent, position, size and type of utilities shown on the Drawings issued to the Plot Developer have been based on information extracted from the records of the various public utilities, service providers, Ministries and the Project survey and must be regarded as approximate only.

 

The Plot Developer shall, as part of his Site Layout Plan submission, provide details of required lay-down, storage, and staging requirements. The Plot Developer shall note that no additional storage will be available beyond the work area.

 

The Plot Developer shall submit for approval a Site Layout Plan showing the proposed layout of all temporary facilities. The plan shall provide details of location and size of all temporary facilities including site offices, plant, temporary utilities, sanitary facilities, materials storage areas,...

 

Vehicle parking will be allowed in designated areas only if available. No personal vehicle access to individual plot sites will be provided to Plot Developers. Any access will be subject to on-going phasing and construction requirements. Parking is prohibited on the development roads. A vehicle tow...

 

Master Developer will provide site security at designated access points only. The intent of the security at access points will be to control vehicular traffic only. Additionally, several mobile security forces will travel the site on a regular basis, 24 hours a day.

 

The Hoisting and Craneage Plan shall include a layout for all hoist/crane infrastructures. The Plot Developer should consider all detailed information such as hoist arrangements, platforms, loading deck, mast sections, hoist equipment, details of attachment to building, gates, fences, safety...

 

Construction vehicles and equipment shall not enter areas designated for site offices. All vehicular entries and exits shall be through security outposts and gates. Only authorized vehicles and equipment are allowed entry to Site. The Developer shall submit to the Master Developer's Project Manager...

 

Material deliveries shall be planned to meet schedule and construction requirements. The Plot Developer shall conform to the procedures related to entry permits and authorization, as prescribed by the Master Developer or the Master Developer's Project Manager. Excess material resulting from...

 

All shoring and removal of, and underpinning shall be approved by the Master Developer and must comply with the safety requirements of all relevant local and international standards. Remedial underpinning shall be performed where existing foundations are inadequate. Precautionary underpinning shall...

 