Engineering Services





Construction Control Guidelines for Existing Services

Construction Control Guidelines for Existing Services

The extent, position, size and type of utilities shown on the Drawings issued to the Plot Developer have been based on information extracted from the records of the various public utilities, service providers, Ministries and the Project survey and must be regarded as approximate only.

MEP Specifications For Building Construction

MEP Works

The acronym MEP became an integral word of a building project in Middle East Gulf region during year 2000. In the inception stage of MEP, there were involvement of only two engineering branches, Mechanical and Electrical, now it included electronics, instrumentation and communication. In some occasions, Mechatronics also partake in the project for smooth completion of the whole MEP works. Companies that carry out MEP works also known as Electro-Mechanical company which has multi-faceted technicians and engineers for effective design, coordination and execution of the works.

Construction Quality Plan Of Building - Stores Procedures for Site Stores

These procedures are applicable for site stores and shall be implemented along with procedures governing Main Stores and Branch Stores.

1. Responsibilities

The site storekeeper reports to the Branch Stores Department /Main Stores Department through the Project Manager at site.

The responsibilities of the site storekeeper:-

Construction Quality Plan Of Building Projects- Procedures And Work Instructions

The company standard procedures will be implemented for the project however should a situation arise where this may be detrimental to the project or where an improvement could be made to a standard procedure the Project Manager shall be notified. With agreement of the Quality Assurance Manager a project procedure may be established and thus added to the Quality plan.

Construction Quality Plan for Building Projects

Construction Quality Plan for Building Projects

It is essential that services and systems in a building construction contract work are provided to conform to the requirements of the customer, and that the activities be effected as economically as practical. The achievement of these objectives is facilitated by setting up working procedures and practices, which collectively provide a Work Efficient, yet controlled operating environment.

Structured Cabling For Communications - Wiring For Voice / Data In Building Construction Works

Category 6 Voice / Data cables

The Contractor shall design, supply and install outlet plates, conduits, trunking, trays, wiring, junction boxes, distribution frames, patch panels, data rack, backbone cables, etc. necessary to form a complete structured system for voice and data cabling within the buildings. Cabling / wiring shall be provided for voice system from patch panel location to each voice/data outlet. Draw wires shall be provided in conduits for future data cabling / wiring by others (if applicable). The installation shall comply with the requirements of ANSI / EIA / TIA-568-1991 as appropriate as well as Local Telecom Authority.

Medium Voltage Distribution System In Electrical Construction

Specification for Medium Voltage Distribution System In Electrical Construction Contract Works

The work included within this section is for the supply, connection, testing and commissioning of 13.8 KV switch gears, cables, package sub station and all the related accessories necessary for the proper operation of the system as shown and described on drawings, bill of quantity and herein. The contractor shall coordinate with the other services (trades) involved in the project to insure that the foundation, are suitable for the equipment to be installed.

Method Statement For Installation Of Cable Tray Or Trunking

Ladder type Cable Tray Installation Method

Method Statement For Installation Of Cable Tray Or Trunking System For Building Electrical Services described here. This method statement is written for the purpose of establishing method and procedures for the Installation of Cable Tray and G.I Trunking System for the building MEP services.

Value Engineering and Its Importance In Engineering Industry

Value Engineering

The value is a function of cost. Therefore, it can be increased either by improving the function or reducing cost. The maximum value is achieved when the function performs reliably at the lowest cost. A key principle of value engineering that basic functions be preserved and not reduced as a result of improvements in value. Thus Value Engineering (VE) is a systematic method to improve the "value" of goods, products or services through an examination of the function.