Method Statement | lopol.org

Method Statement

Method Statement For Installation of Electrical DB, SMDB and MDB Panelboards

Electrical Panel Boards - DB, SMDB and MDB
This statement is written for the purpose of establishing method and procedures for the Installation of DB, SMDB and MDB. Installation: To make sure that the entire installation is in conformance and in accordance with the design intent of the project for the Electrical and Low Voltage System in addition to the specification and as per approved shop drawings and comply.

Method Statement For The Installation Of Power and Lighting System Wiring

Electrical Power and Lighting System Wiring
This method of statement specifies the detailed requirements and procedures for the installation of Power and Lighting System Wiring. Installation: No wiring be carried out until the appropriate tests required or in the electrical testing section have been done and the consultant has given his clearance for wiring to commence. A loop in form of wiring shall be used as far as practicable or unless otherwise indicated. Joints in conductors shall be made using insulated terminal blocks complying with requirements of this specification.

Method Statement For Installation Of Cable Tray Or Trunking

Ladder type Cable Tray Installation Method
Method Statement For Installation Of Cable Tray Or Trunking System For Building Electrical Services described here. This method statement is written for the purpose of establishing method and procedures for the Installation of Cable Tray and G.I Trunking System for the building MEP services.

Method Statement For Installation Of Galvanized Conduits On Exposed Surface

Method Statement For Installation Of Galvanized Conduits On Exposed Surface
Method Statement For Installation Of Galvanized Conduits that has to be installed on the Exposed Surface of a building is described here. This method of statement specify the detailed requirements and procedures for the installation of Galvanized Conduits for the exposed surface installation requirement for MEP services of the above building.